Shimano Ultegra Di2 RD-R8150F 12-Speed Rear Derailleur (Shadow, Top Normal, Direct Attachment)
Specifications
| Series |
ULTEGRA
|
||
|---|---|---|---|
| Model no. | RD-R8150 | ||
| Color | 1 |
Series color
|
|
| Rear speeds |
12
|
||
| RD construction | SHIMANO SHADOW RD |
Yes
|
|
| Applicable derailleur hanger | SHIMANO ROAD type | Direct attachment (conventional) |
Yes
|
| Direct mount |
Yes
|
||
| UDH standard |
Yes
|
||
| Max. front difference |
16T
|
||
| Total capacity |
39T
|
||
| Low sprocket | Max. |
34T
|
|
| Min. |
30T
|
||
| Top sprocket | Max. |
11T
|
|
| Min. |
11T
|
||
| Fluoric coated link bushings |
4
|
||
| Pulley | Guide pulley bearing |
Yes
|
|
| Tension pulley bearing |
Yes
|
||
| Teeth |
11T
|
||
| Screws material |
Stainless steel
|
||
| Sunken type pulley screw |
Yes
|
||
| Bracket | Material |
Aluminum
|
|
| Finish |
Painted
|
||
| B-axle | Hollow axle |
Yes
|
|
| Material |
Stainless steel
|
||
| Finish |
Painted
|
||
| B-axle 2 | Hollow axle |
Yes
|
|
| Material |
Aluminum
|
||
| Finish |
Anodized
|
||
| Bracket body | Material |
Aluminum
|
|
| Finish |
Painted
|
||
| P-axle | Material |
Steel
|
|
| Finish |
Passivation
|
||
| Plate body | Material |
GFRP
|
|
| Finish |
Painted
|
||
| Outer link | Material |
Aluminum
|
|
| Finish |
Painted
|
||
| Inner link | Material |
GFRP
|
|
| Outer plate | Material |
Aluminum
|
|
| Finish |
Painted
|
||
| Inner plate | Material |
Aluminum
|
|
| Finish |
Painted
|
||
| Stroke adjusting screw | Material |
Steel
|
|
| Finish |
Plated
|
||
| Di2 connectivity wired | Di2 shifting |
Yes
|
|
| Di2 connectivity wireless | Di2 shifting |
Yes
|
|
| Bluetooth® LE custom (*1) | Adjust mode information |
Yes
|
|
| Di2 battery level |
Yes
|
||
| Gear position |
Yes
|
||
| SHIMANO E-BIKE SYSTEMS data items (*3) |
Yes
|
||
| Compatible with E-TUBE RIDE |
Yes
|
||
| Compatible with E-TUBE PROJECT |
Yes
|
||
| ANT private (*2) | Adjust mode information |
Yes
|
|
| Di2 battery level |
Yes
|
||
| Gear position |
Yes
|
||
| SHIMANO E-BIKE SYSTEMS data items (*3) |
Yes
|
||
| Firmware update by E-TUBE PROJECT |
Yes
|
||
| SD50 port (pcs) |
0
|
||
| SD300 port (pcs) |
1
|
||
| SD50 connector (pcs) |
0
|
||
| SD300 connector (pcs) |
0
|
||
| LED for system status |
Yes
|
||
| Power supply | Wired |
Yes
|
|
| Charging port |
Yes
|
||
| Charging cable |
EW-EC300
|
||
| Average weight (g) |
262g
|
||
Shipping Process
Handling Time: The package will be shipped from our logistic warehouse up to 2 business days after payment process is completed.
Your package tracking number will be sent to you immediately after shipping, using this number you can follow your package status on UPS website or USPS website.
Customs & other duties
Import duties, taxes, and charges are not included in the item price or shipping cost. These charges are the buyer's responsibility.
Note: Customs process may cause delay with estimate delivery time.
